# 43 CFR 404.49 What criteria will Reclamation use to determine whether to recommend that a proposed rural water supply project be authorized for construction?

43 CFR 404.49 What criteria will Reclamation use to determine whether to recommend that a proposed rural water supply project be authorized for construction?, “What criteria will Reclamation use to determine whether to recommend that a proposed rural water supply project be…”, is a CFR section of [43 CFR Part 404, Subpart D—Feasibility Studies](https://ontology.bommaritollc.com/id/01a0f0b6-2309-7795-84f1-ac479dcd71b2); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f0b6-33f6-70a2-a070-ee969d73cada>

Within: [Title 43—Public Lands: Interior](https://ontology.bommaritollc.com/id/01a0f0b6-2164-74f4-94ff-658e41b0c580) › [43 CFR Subtitle B—Regulations Relating to Public Lands](https://ontology.bommaritollc.com/id/01a0f0b6-22ff-71b4-adae-c3f121449495) › [43 CFR Chapter I—BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR](https://ontology.bommaritollc.com/id/01a0f0b6-2301-748e-9d58-74a7e92f26da) › [43 CFR Part 404—Reclamation Rural Water Supply Program](https://ontology.bommaritollc.com/id/01a0f0b6-2799-777f-87f4-8c3f84eb7046) › [43 CFR Part 404, Subpart D—Feasibility Studies](https://ontology.bommaritollc.com/id/01a0f0b6-2309-7795-84f1-ac479dcd71b2)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 43 CFR 404.49](https://ontology.bommaritollc.com/id/01a0f0b6-33f7-7417-8123-565bd556094f)
- `eli:cites`:
  - [43 CFR 404.4 What are the goals of the program?](https://ontology.bommaritollc.com/id/01a0f0b6-33b2-75e3-8eb0-033409921408)
  - [43 CFR 404.13 What criteria will Reclamation use to prioritize requests for assistance under the program?](https://ontology.bommaritollc.com/id/01a0f0b6-33bf-70fc-bbe9-039ed2a68612)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title43-vol1](https://ontology.bommaritollc.com/id/01a0f0b6-33f6-70a2-a070-ee9594727d3d)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b6-58e2-7676-9407-4bc928a2083b)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-9e1c-7158-8334-05b9877b235d)
  - [evidence from https://www.govinfo.gov/link/cfr/43/404?sectionnum=49&year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f18-02e2-7583-86c7-1adb491b5a6b)
- `schema:isPartOf`: [43 CFR Part 404, Subpart D—Feasibility Studies](https://ontology.bommaritollc.com/id/01a0f0b6-2309-7795-84f1-ac479dcd71b2)
- `schema:legislationIdentifier`: 43 CFR 404.49
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: What criteria will Reclamation use to determine whether to recommend that a proposed rural water supply project be authorized for construction?
- `schema:url`: [https://www.govinfo.gov/link/cfr/43/404?sectionnum=49&year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/43/404?sectionnum=49&year=mostrecent&link-type=details)
- `skos:prefLabel`: 43 CFR 404.49 What criteria will Reclamation use to determine whether to recommend that a proposed rural water supply project be authorized for construction?

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/43/404?sectionnum=49&year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title43-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (2; `eli:cites`):
  - [43 CFR 404.48 What process will Reclamation follow to determine if a feasibility study is ready for review?](https://ontology.bommaritollc.com/id/01a0f0b6-33f4-7679-983a-b390046e4770)
  - [43 CFR 404.50 What information will be included in the feasibility report prepared by Reclamation.](https://ontology.bommaritollc.com/id/01a0f0b6-33f7-7417-8123-565dacc01464)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0b6-33f6-70a2-a070-ee969d73cada.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0b6-33f6-70a2-a070-ee969d73cada.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0b6-33f6-70a2-a070-ee969d73cada.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0b6-33f6-70a2-a070-ee969d73cada)
Cite as: 43 CFR 404.49 What criteria will Reclamation use to determine whether to recommend that a proposed rural water supply project be authorized for construction?. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0b6-33f6-70a2-a070-ee969d73cada
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
