# 43 CFR 3271.12 What do I need to start preliminary site investigations that may disturb the surface?

43 CFR 3271.12 What do I need to start preliminary site investigations that may disturb the surface?, “What do I need to start preliminary site investigations that may disturb the surface?”, is a CFR section of [43 CFR Part 3200, Subpart 3271—Utilization Operations: Getting a Permit](https://ontology.bommaritollc.com/id/01a0f0b6-24ed-7324-87f8-81ed6c610c7c); in force.

IRI: <https://ontology.bommaritollc.com/id/01a0f0b6-4183-76f8-9739-d7fbf8e86dec>

Within: [Title 43—Public Lands: Interior](https://ontology.bommaritollc.com/id/01a0f0b6-2164-74f4-94ff-658e41b0c580) › [43 CFR Subtitle B—Regulations Relating to Public Lands](https://ontology.bommaritollc.com/id/01a0f0b6-22ff-71b4-adae-c3f121449495) › [43 CFR Chapter II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR](https://ontology.bommaritollc.com/id/01a0f0b6-2332-7127-bc6d-d2a7b11eacff) › [43 CFR Chapter II, Subchapter C—MINERALS MANAGEMENT (3000)](https://ontology.bommaritollc.com/id/01a0f0b6-23f6-773d-b66f-eeb410b94261) › [43 CFR Part 3200—Geothermal resource leasing](https://ontology.bommaritollc.com/id/01a0f0b6-280c-737e-9898-97c5de76f118) › [43 CFR Part 3200, Subpart 3271—Utilization Operations: Getting a Permit](https://ontology.bommaritollc.com/id/01a0f0b6-24ed-7324-87f8-81ed6c610c7c)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [cfr-section 43 CFR 3271.12](https://ontology.bommaritollc.com/id/01a0f0b6-4185-7286-8220-759a5858bd3a)
- `eli:cites`:
  - [43 CFR 3251.14 Do I need a bond for conducting exploration operations?](https://ontology.bommaritollc.com/id/01a0f0b6-4129-75b2-a550-c26c49071e56)
  - [43 CFR 3273.19 What are the bonding requirements for a site license?](https://ontology.bommaritollc.com/id/01a0f0b6-41d4-70f0-b8ca-90e67cf02776)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/CFR-2025-title43-vol1](https://ontology.bommaritollc.com/id/01a0f0b6-4183-76f8-9739-d7fafdc7d282)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0b6-5be0-7568-ae00-3cd5f3629fa8)
  - [evidence from https://www.govinfo.gov/app/details/](https://ontology.bommaritollc.com/id/01a0f0d1-a0c7-74df-b5bb-bdebb085d9f0)
  - [evidence from https://www.govinfo.gov/link/cfr/43/3200?year=mostrecent&link-type=details](https://ontology.bommaritollc.com/id/01a10f18-0542-769f-a65a-5b3195d052ed)
- `schema:isPartOf`: [43 CFR Part 3200, Subpart 3271—Utilization Operations: Getting a Permit](https://ontology.bommaritollc.com/id/01a0f0b6-24ed-7324-87f8-81ed6c610c7c)
- `schema:legislationIdentifier`: 43 CFR 3271.12
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationLegalForce`: [schema:InForce](https://schema.org/InForce)
- `schema:legislationType`: [CFR section](https://ontology.bommaritollc.com/vocab/leg/cfrSection)
- `schema:name`: What do I need to start preliminary site investigations that may disturb the surface?
- `schema:url`: [https://www.govinfo.gov/link/cfr/43/3200?year=mostrecent&link-type=details](https://www.govinfo.gov/link/cfr/43/3200?year=mostrecent&link-type=details)
- `skos:prefLabel`: 43 CFR 3271.12 What do I need to start preliminary site investigations that may disturb the surface?

## Elsewhere

- [Official page](https://www.govinfo.gov/link/cfr/43/3200?year=mostrecent&link-type=details) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/CFR-2025-title43-vol1) (www.govinfo.gov)
- [Source](https://www.govinfo.gov/app/details/) (www.govinfo.gov)

## Pointing here

- Cited by (1; `eli:cites`):
  - [43 CFR 3214.13 What is the minimum dollar amount required for a bond?](https://ontology.bommaritollc.com/id/01a0f0b6-40f2-73a5-ad9f-8eb240f416ca)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a0f0b6-4183-76f8-9739-d7fbf8e86dec.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a0f0b6-4183-76f8-9739-d7fbf8e86dec.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a0f0b6-4183-76f8-9739-d7fbf8e86dec.nt), [HTML](https://ontology.bommaritollc.com/id/01a0f0b6-4183-76f8-9739-d7fbf8e86dec)
Cite as: 43 CFR 3271.12 What do I need to start preliminary site investigations that may disturb the surface?. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a0f0b6-4183-76f8-9739-d7fbf8e86dec
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
