Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
46 CFR Part 159—Approval of equipment and materials
46 CFR Part 159—Approval of equipment and materials, “Approval of equipment and materials”, is a CFR part of 46 CFR Chapter I, Subchapter Q—EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL; it is made under 4 laws; in force.
https://ontology.bommaritollc.com/id/01a0f0bc-06c2-71c7-b604-666c03b79ae7
Elsewhere
Facts
| adms:identifier | |
| authority note | 46 U.S.C. 3306, 3703; DHS Delegation 00170.1, Revision No. 01.4; Section 159.001-9 also issued under the authority of 44 U.S.C. 3507.en |
| eli:based_on | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 46 CFR Part 159 |
| schema:legislationJurisdiction | |
| schema:legislationLegalForce | |
| schema:legislationType | |
| schema:name | Approval of equipment and materialsen |
| schema:url | |
| skos:prefLabel | 46 CFR Part 159—Approval of equipment and materialsen |
| source note | CGD 76-048, 44 FR 73043, Dec. 17, 1979, unless otherwise noted.en |
Related
Cited by (42)eli:cites
- 46 CFR 110.15-1 Definitions.
- 46 CFR 160.046-7 Independent laboratory.
- 46 CFR 160.050-5 Sampling, tests, and inspection.
- 46 CFR 160.055-15 Production inspections, tests, and quality control of life preservers.
- 46 CFR 160.076-19 Recognized laboratories.
- 46 CFR 160.076-29 Production oversight.
- 46 CFR 160.115-13 Approval inspections and tests for prototype winches.
- 46 CFR 160.115-15 Production inspections, tests, quality control, and conformance of winches.
- 46 CFR 160.115-7 Design, construction, and performance of winches.
- 46 CFR 160.115-9 Preapproval review.
- 46 CFR 160.132-13 Approval inspections and tests for prototype davits.
- 46 CFR 160.132-15 Production inspections, tests, quality control, and conformance of davits.
- 46 CFR 160.132-7 Design, construction, and performance of davits.
- 46 CFR 160.133-13 Approval inspections and tests for prototype release mechanisms.
- 46 CFR 160.133-15 Production inspections, tests, quality control, and conformance of release mechanisms.
- 46 CFR 160.133-7 Design, construction, and performance of release mechanisms.
- 46 CFR 160.133-9 Preapproval review.
- 46 CFR 160.135-11 Fabrication of prototype lifeboats for approval.
- 46 CFR 160.135-13 Approval inspections and tests for prototype lifeboats.
- 46 CFR 160.135-15 Production inspections, tests, quality control, and conformance of lifeboats.
- 46 CFR 160.135-7 Design, construction, and performance of lifeboats.
- 46 CFR 160.135-9 Preapproval review.
- 46 CFR 160.151-11 Approval procedure.
- 46 CFR 160.151-31 Production inspections and tests of inflatable liferafts.
- 46 CFR 160.151-9 Independent laboratory.
- 46 CFR 160.156-11 Fabrication of prototype rescue boats and fast rescue boats for approval.
- 46 CFR 160.156-13 Approval inspections and tests for prototype rescue boats and fast rescue boats.
- 46 CFR 160.156-15 Production inspections, tests, quality control, and conformance of rescue boats and fast rescue boats.
- 46 CFR 160.156-7 Design, construction and performance of rescue boats and fast rescue boats.
- 46 CFR 160.156-9 Preapproval review.
12 more
- 46 CFR 160.170-13 Approval inspections and tests for prototype automatic release mechanisms.
- 46 CFR 160.170-15 Production inspections, tests, quality control, and conformance of release mechanisms.
- 46 CFR 160.170-7 Design, construction, and performance of automatic release mechanisms.
- 46 CFR 160.170-9 Preapproval review.
- 46 CFR 160.176-15 Production tests and inspections.
- 46 CFR 161.002-15 Sample extraction smoke detection systems.
- 46 CFR 161.002-18 System method of applications for equipment approval.
- 46 CFR 161.002-19 Device method of application for equipment approval.
- 46 CFR 175.400 Definitions of terms used in this subchapter.
- 46 CFR 199.175 Survival craft and rescue boat equipment.
- 46 CFR 2.75-10 Procedures for obtaining approvals.
- FR Doc. 2023-08400: Marine Equipment on Board Vessels and Offshore Units or Facilities
Parts (5)schema:isPartOf
- 46 CFR Part 159, Subpart 159.001—General
- 46 CFR Part 159, Subpart 159.003—Approvals Under Mutual Recognition Agreements (MRA)
- 46 CFR Part 159, Subpart 159.005—Approval Procedures
- 46 CFR Part 159, Subpart 159.007—Production Inspection and Tests of Approved Equipment and Materials
- 46 CFR Part 159, Subpart 159.010—Independent Laboratory: Acceptance, Recognition, and Termination