Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
47 CFR Part 68, Subpart C—Terminal Equipment Approval Procedures
47 CFR Part 68, Subpart C—Terminal Equipment Approval Procedures, “Terminal Equipment Approval Procedures”, is a CFR division of 47 CFR Part 68—Connection of terminal equipment to the telephone network.
https://ontology.bommaritollc.com/id/01a0f0be-3c5c-75dc-85ad-0305fff736d1
Elsewhere
Facts
| adms:identifier | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 47 CFR Part 68, Subpart C |
| schema:legislationJurisdiction | |
| schema:legislationType | |
| schema:name | Terminal Equipment Approval Proceduresen |
| skos:prefLabel | 47 CFR Part 68, Subpart C—Terminal Equipment Approval Proceduresen |
Related
Parts (7)schema:isPartOf
- 47 CFR 68.201 Connection to the public switched telephone network.
- 47 CFR 68.211 Terminal equipment approval revocation procedures.
- 47 CFR 68.213 Installation of other than “fully protected” non-system simple customer premises wiring.
- 47 CFR 68.214 Changes in other than “fully protected” premises wiring that serves fewer than four subscriber access lines.
- 47 CFR 68.215 Installation of other than “fully protected” system premises wiring that serves more than four subscriber access lines.
- 47 CFR 68.218 Responsibility of the party acquiring equipment authorization.
- 47 CFR 68.224 Notice of non-hearing aid compatibility.