# FR Doc. 2023-11190: Draft Interim Staff Guidance: Advanced Reactor Content of Application Project Chapter 12, “Post-Construction Inspection, Testing, and Analysis Program”

FR Doc. 2023-11190: Draft Interim Staff Guidance: Advanced Reactor Content of Application Project Chapter 12, “Post-Construction Inspection, Testing, and Analysis Program”, “Draft Interim Staff Guidance: Advanced Reactor Content of Application Project Chapter 12, “Post-Construction…”, is a Federal Register notice, by [Nuclear Regulatory Commission](https://ontology.bommaritollc.com/id/01a0ee04-de89-70ed-b8fe-b5c43a27e569).

IRI: <https://ontology.bommaritollc.com/id/01a110b2-6fe6-77d3-b85c-2d37bd3d8c75>

Within: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0) › [Government of United States](https://ontology.bommaritollc.com/id/01a0ee04-ddfb-711a-a65c-9de9ee96b9ab) › [Nuclear Regulatory Commission](https://ontology.bommaritollc.com/id/01a0ee04-de89-70ed-b8fe-b5c43a27e569)

Type: [schema:Legislation](https://schema.org/Legislation)

- `adms:identifier`: [us-fr-document 2023-11190](https://ontology.bommaritollc.com/id/01a110b2-6fe8-70f1-8bd5-3f5a229baa4b)
- `dcterms:bibliographicCitation`: 88 FR 33920
- `dcterms:issued`: 2023-05-25 (xsd:date)
- `prov:wasDerivedFrom`:
  - [evidence from https://www.govinfo.gov/app/details/FR-2023-05-25/2023-11190](https://ontology.bommaritollc.com/id/01a110b2-6fe6-77d3-b85c-2d3675a12dfc)
  - [evidence from https://www.govinfo.gov/app/details/FR-2023-05-25/2023-11190](https://ontology.bommaritollc.com/id/01a127b1-c641-70c1-9db8-0a2bde6e92fa)
- `schema:legislationIdentifier`: FR Doc. 2023-11190
- `schema:legislationJurisdiction`: [United States](https://ontology.bommaritollc.com/id/01a0ed8e-f797-7004-b7f5-bec2695977c0)
- `schema:legislationPassedBy`: [Nuclear Regulatory Commission](https://ontology.bommaritollc.com/id/01a0ee04-de89-70ed-b8fe-b5c43a27e569)
- `schema:legislationType`: [Federal Register notice](https://ontology.bommaritollc.com/vocab/leg/federalRegisterNotice)
- `schema:name`: Draft Interim Staff Guidance: Advanced Reactor Content of Application Project Chapter 12, “Post-Construction Inspection, Testing, and Analysis Program”
- `schema:url`: [https://www.govinfo.gov/app/details/FR-2023-05-25/2023-11190](https://www.govinfo.gov/app/details/FR-2023-05-25/2023-11190)
- `skos:prefLabel`: FR Doc. 2023-11190: Draft Interim Staff Guidance: Advanced Reactor Content of Application Project Chapter 12, “Post-Construction Inspection, Testing, and Analysis Program”

## Elsewhere

- [Official page](https://www.govinfo.gov/app/details/FR-2023-05-25/2023-11190) (www.govinfo.gov)

## Pointing here

- Its event of, from (1; `bcleg:eventOf`):
  - [FR Doc. 2023-11190: published 2023-05-25](https://ontology.bommaritollc.com/id/01a127b3-9e11-7538-b32e-a740153d062f)

---
Also as: [Turtle](https://ontology.bommaritollc.com/id/01a110b2-6fe6-77d3-b85c-2d37bd3d8c75.ttl), [JSON-LD](https://ontology.bommaritollc.com/id/01a110b2-6fe6-77d3-b85c-2d37bd3d8c75.jsonld), [N-Triples](https://ontology.bommaritollc.com/id/01a110b2-6fe6-77d3-b85c-2d37bd3d8c75.nt), [HTML](https://ontology.bommaritollc.com/id/01a110b2-6fe6-77d3-b85c-2d37bd3d8c75)
Cite as: FR Doc. 2023-11190: Draft Interim Staff Guidance: Advanced Reactor Content of Application Project Chapter 12, “Post-Construction Inspection, Testing, and Analysis Program”. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a110b2-6fe6-77d3-b85c-2d37bd3d8c75
Release 0.1.0-rc38, graph hash 05350a11cf9d0c42fba51e92b877115781ab65cb92afcd6b172ff9f8f4abf0bd.
