bc-ontologyGovernments, institutions, geography and law
Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.

FR Doc. 2023-13688: Draft Interim Staff Guidance: Advanced Reactor Content of Application Project Chapter 12, “Post-Construction Inspection, Testing, and Analysis Program”

FR Doc. 2023-13688: Draft Interim Staff Guidance: Advanced Reactor Content of Application Project Chapter 12, “Post-Construction Inspection, Testing, and Analysis Program”, “Draft Interim Staff Guidance: Advanced Reactor Content of Application Project Chapter 12, “Post-Construction…”, is a Federal Register notice, by Nuclear Regulatory Commission.

https://ontology.bommaritollc.com/id/01a110b2-8b07-72d8-95bd-d0206bc747d5
schema:Legislation
Download TurtleJSON-LDN-TriplesMarkdown
Cite this
FR Doc. 2023-13688: Draft Interim Staff Guidance: Advanced Reactor Content of Application Project Chapter 12, “Post-Construction Inspection, Testing, and Analysis Program”. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a110b2-8b07-72d8-95bd-d0206bc747d5

Elsewhere

Facts

adms:identifier
dcterms:bibliographicCitation
88 FR 41987
dcterms:issued
2023-06-28xsd:date
prov:wasDerivedFrom
schema:legislationIdentifier
FR Doc. 2023-13688
schema:legislationJurisdiction
schema:legislationPassedBy
schema:legislationType
schema:name
Draft Interim Staff Guidance: Advanced Reactor Content of Application Project Chapter 12, “Post-Construction Inspection, Testing, and Analysis Program”en
schema:url
skos:prefLabel
FR Doc. 2023-13688: Draft Interim Staff Guidance: Advanced Reactor Content of Application Project Chapter 12, “Post-Construction Inspection, Testing, and Analysis Program”en

Related

Its event of, from (1)bcleg:eventOf