Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
source excerpt from https://admincode.legislature.state.al.us/api/chapter/335-15-4
https://ontology.bommaritollc.com/id/01a136dc-2b12-77cf-884a-2c9a08febdf6
Elsewhere
Sourceadmincode.legislature.state.al.us
Facts
| adms:identifier | |
| oa:bodyValue | {"legal_state":"unknown","passage":{"end_byte":11987,"instrument_iri":"https://ontology.bommaritollc.com/id/01a136db-1acc-72da-a972-9b95dc536a5e","original_sha256":"f7b9f552781fb93b38b5a4c43f1b4842cddde7fcddb79b4981303adb0092ce37","parsed_text_sha256":"564db245b6ec0b1422daef16ee7216290ace56065e4186d5da781265435a1200","source_url":"https://admincode.legislature.state.al.us/api/chapter/335-15-4","start_byte":0},"policy":"retained-legal-source-passage-v1","quote":"ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT\n\nLAND DIVISION\n\nADMINISTRATIVE CODE\n\nCHAPTER 335-15-4\n\nTECHNICAL INFORMATION\n\nTABLE OF CONTENTS\n\n335-15-4-.01 Purpose\n\n335-15-4-.02 Limitation Of Liability Qualifications\n\n335-15-4-.03 Voluntary Property Assessment Plans\n\n335-15-4-.04 Voluntary Cleanup Plans\n\n335-15-4-.05 Cleanup Requirements\n\n335-15-4-.06 Certificate Of Compliance-Letter Of\n\nConcurrence\n\n335-15-4-.01 Purpose\n\n.\n\nEstablishes criteria for the submission of voluntary property\n\nassessment plans and other technical information, liability\n\nlimitations, assessments, plans, cleanup requirements, and\n\ncertification of compliance.\n\nAuthor: Fred A. Barnes; Keith N. West; Lawrence A. Norris;\n\nStephen A. Cobb; Sonja B. Favors; Austin R. Pierce; Pamela L.\n\nMonaghan\n\nStatutory Authority: Code of Ala. 1975, §22-30E-9.\n\nHistory: New Rule: Filed April 11, 2002; effective May 16, 2002.\n\nAmended: Filed October 21, 2004; effective November 25, 2004.\n\nAmended: Published April 29, 2022; effective June 13, 2022.\n\nAmended: Published February 29, 2024; effective April 14, 2024.\n\n335-15-4-.02 Limitation Of Liability Qualifications\n\n.\n\n(1) Limitation of liability criteria. To qualify for a limitation\n\nof liability as provided in the Code of Alabama 1975,\n\n§§22-30E-9(a) and 22-30E-10(b), an applicant shall meet all the\n\nfollowing criteria:\n\n(a) The applicant shall not be a responsible person, as\n\ndefined in 335-15-1-.02, at the qualifying property.\n\n(b) Where the applicant is an individual, the individual shall\n\nnot:\n\n1. Be a relative by blood within the third degree of\n\nconsanguinity or by marriage; or\n\nRevised 4/14/24 4-1\n\n2. Be an employee, shareholder, officer, or agent; or\n\notherwise be affiliated with a current owner of the\n\nsubject property or any responsible person on the subject\n\nproperty.\n\n(c) Where the applicant is a corporation or other legal\n\nentity, the corporation must not:\n\n1. Be a current or former subsidiary, division, parent\n\ncompany, or partner of a current owner; or\n\n2. Be the employer or former employer of the current\n\nowner; or\n\n3. Be any responsible person on the subject property.\n\n(d) The limitation of liability provided by the Code of\n\nAlabama 1975, §§22-30E-9(a)and 22-30E-10 shall be contingent\n\nupon the applicant’s good faith implementation of the\n\nvoluntary property assessment and/or voluntary cleanup plan as\n\napproved by the Department. Such limitation of liability shall\n\nnot be applicable to any activities conducted on the\n\nqualifying property before the Department’s approval of the\n\nvoluntary property assessment plan, cleanup plan, or\n\nconcurrence with a certification of compliance, whichever\n\noccurs first.\n\n(2) Inability to meet limitation of liability criteria. Applicants\n\nwho do not meet the criteria in 335-15-4-.02(1), shall qualify\n\nonly for a limitation of liability upon acceptance by the\n\nDepartment of the certification of compliance for cleanup of the\n\nsite.\n\n(3) Revocation of limitation of liability. If the Department\n\ndetermines the assessment or cleanup is not being implemented in\n\naccordance with the approved plan, it will notify the applicant\n\nand give reasonable opportunity to correct the deficiency. Failure\n\nto correct noted deficiencies shall result in the revocation of\n\nthe limitation of liability protection afforded by the Alabama\n\nLand Recycling and Economic Redevelopment Act.\n\n(4) Fiduciary limitation of liability. A lender, including one\n\nserving as a trustee, personal representative, or in any other\n\nfiduciary capacity in connection with a loan, or a lender holding\n\nevidence of ownership of a qualifying property primarily to\n\nprotect a security interest, or as a result of foreclosure or a\n\ndeed in lieu of foreclosure of a security interest, is entitled to\n\nthe liability protection established in the Code of Alabama 1975,\n\n§22-30E-9 if the lender meets each of the following requirements:\n\n(a) The lender has not caused or contributed to a release of a\n\ncontaminant at the qualified property;\n\nRevised 4/14/24 4-2\n\n\n(b) The lender seeks to sell, transfer, or otherwise divest\n\nthe qualifying property at the earliest time; and\n\n(c) The lender has not divested the borrower of, or otherwise\n\nengaged in, decision-making control of assessment or cleanup\n\nactivities at the qualifying property or operations at the\n\nqualifying property or undertaken management activities beyond\n\nthose required to protect its financial interest while making\n\na good faith effort to sell the qualifying property;\n\n(5) Extension of Limitation of Liability. The limitation of\n\nliability provided by the Code of Alabama 1975, §22-30E-9 and\n\n22-30E-10 shall extend to the heirs, assigns, and designees of the\n\nperson to whom such limitation of liability is granted; provided,\n\nhowever, that, except as may be provided by the Code of Alabama\n\n1975, §22-30E-9(a), §22-30E-9(f)or §22-30E-9(g), such extension of\n\nthe limitation of liability shall not operate to absolve from\n\nliability any person deemed to be a responsible person on the\n\nqualifying property.\n\n(6) Departmental Response to Release. Nothing in 335-15-4 shall\n\nlimit the authority of the Department to take action in response\n\nto any release or threat of release of regulated substances.\n\n(7) Preexisting Contamination or Release Reporting. As provided in\n\nthe Code of Alabama 1975, §22-30E-4, the reporting of preexisting\n\ncontamination or a preexisting release detected during the course\n\nof due diligence or site assessment activities to the Department,\n\nprovided that any release reporting obligations shall be co\u0002\n\nextensive with federal release-reporting obligations.\n\n(8) Preexisting And New Release Liability. As provided in Code of\n\nAlabama 1975, §22-30E-8 and §22-30E-10 upon the first to occur of\n\nthe Department's approval of a voluntary property assessment plan,\n\napproval of a voluntary cleanup plan, or concurrence with the\n\ncertification of compliance, with respect to a qualifying\n\nproperty, a responsible person applicant or an applicant shall be\n\nfully discharged and released from any and all liability to the\n\nstate or to any other person, including any successor in interest\n\nto the applicant, with respect to the qualifying property for\n\npost-remediation costs incurred in connection with, equitable\n\nrelief relating to, or damages resultant from, in whole or in\n\npart, a preexisting release at the qualifying property.\n\n(9) Regulatory Compliance and Limitation of Liability. If, during\n\nthe course of the assessment and or remediation process, the site\n\nbecomes an active industrial facility, the facility will then be\n\nresponsible for maintaining compliance with all applicable state\n\nand federal regulations. The limitation of liability provided in\n\n335-15-4-.02(1), 335-15-4-.02(4), and 335-15-4-.02(8) does not\n\nextend to:\n\nRevised 4/14/24 4-3\n\n\n(a) Release(s) as a result of new industrial activity\n\noccurring during the assessment and, or remediation phase of\n\nthe cleanup,\n\n(b) Activities not described in the voluntary cleanup\n\nassessment plan or the voluntary cleanup work plan(s); or\n\n(c) Release(s) that occur on the qualifying property after\n\nDepartmental acceptance of the certification of compliance as\n\na result of noncompliance with the applicable response action\n\nor land use controls within the environmental covenant by the\n\napplicant or successor in interest to the applicant.\n\nAuthor: Lawrence A. Norris; Stephen A. Cobb; Sonja B. Favors;\n\n\nPamela L. Monaghan; Crystal L. Collins; Pamela W. Luckie; Lynn T.\n\nRoper\n\nStatutory Authority: Code of Ala. 1975, §§22-30E-4, 22-30E-8,\n\n\n22-30E-922-30-10\n\n, .\n\nHistory: New Rule: Filed April 11, 2002; effective May 16, 2002. Amended: Filed October 21, 2004; effective November 25, 2004. Amended: Published April 29, 2022; effective June 13, 2022. Amended: Published February 29, 2024; effective April 14, 2024.\n\n\n335-15-4-.03 Voluntary Property Assessment Plans\n\n\n.\n\n(1) Submission.\n\n(a) After acceptance of the application by the Department as\n\nrequired in 335-15-3-.03, the applicant shall submit for\n\napproval, a complete and comprehensive Voluntary Property\n\nAssessment Plan for the site,\n\n(b) If a property assessment has already been performed, a\n\ncomplete and representative Voluntary Property Assessment\n\nReport shall be submitted to the Department for review in\n\naccordance with 335-15-4-.03(8)(b).\n\n(2) Content. A Voluntary Property Assessment Plan submitted by an\n\napplicant shall describe in sufficient detail those actions\n\nplanned to develop the information necessary to perform a risk\n\nassessment or identify applicable cleanup standards for the\n\nqualifying property utilizing requirements found in the Alabama\n\nRisk-based Corrective Action Guidance (ARBCA)Manual or other\n\nappropriate risk-based corrective action principles through the\n\nappropriate implementation of applicable response actions or land\n\nuse controls. The plan should describe the methods to be used to\n\ndetermine the type(s) and the amount(s) of any contamination\n\nincluding the delineation of all soil and groundwater\n\ncontamination discovered or known to exist within the qualifying\n\nproperty boundaries or portions thereof. Information previously\n\nsubmitted in the application package need not be resubmitted\n\nunless, during the assessment phase, information is discovered\n\nRevised 4/14/24 4-4\n\n\norder to terminate activities at the property, the applicant shall\n\nan approved Voluntary Property Assessment Plan must be modified in\n\n. If the applicant determines that any element of\n\nand submit the proposed modification for approval.\n\nqualifying property, the applicant shall modify the approved plan\n\nassessment or identify applicable cleanup requirements for the\n\norder to develop the information necessary to perform a risk\n\nan approved Voluntary Property Assessment Plan must be modified in\n\n. If the applicant determines that any element of\n\nnotification specifying the basis for making the determination.\n\n, §22-30E-10. The applicant will be provided with written\n\nthe loss of liability protections provided by the\n\nthe deficiencies. Failure to correct deficiencies will result in\n\nnotify the applicant and give a reasonable opportunity to remedy\n\nwith the approved Voluntary Property Assessment Plan, it will\n\nactivities at the property are not being implemented in accordance\n\nAssessment Plan. The applicant shall implement the plan in\n\nthe applicant shall implement the approved Voluntary Property\n\nAssessment Plan, the Department shall specify a time within which\n\n. Upon approval of the Voluntary Property\n\nshall be considered approved if the Department fails to act within\n\nProperty Assessment Plan within 60 days of submittal. The plan\n\n. The Department shall approve a complete Voluntary\n\nengineer licensed in the State of Alabama.\n\nsigned and sealed by a qualified professional geologist or\n\ncontamination shall be contained in a written report authored,\n\nboundary or portions thereof. Such delineation of groundwater\n\nextent to the property boundary within the qualifying property\n\nvertical extent of groundwater contamination and horizontal\n\nfocus on known contaminants and must delineate the full\n\nresponsible person applicant for a qualifying property may\n\n(b) A Voluntary Property Assessment Plan submitted by a\n\nengineer licensed in the State of Alabama.\n\nsigned and sealed by a qualified professional geologist or\n\ncontamination shall be contained in a written report authored,\n\nqualifying property. Such delineation of groundwater\n\nextent of contamination in groundwater on-site only for the\n\nresponsible person must delineate the horizontal and vertical\n\n(a) A Voluntary Property Assessment Plan submitted by a non\u0002\n\nEnvironmental Investigation and Remediation Guidance (AEIRG).\n\nshall be submitted in a format consistent with the Alabama\n\nInformation submitted in the Voluntary Property Assessment Plan\n\nwhich is contrary to that information in the application package.\n\nEnvironmental Management\n\n\n(3) Approval\n\n","statutory_number":null,"whole_instrument_recall":"not_established"}rdf:JSON |
| oa:hasSource | |
| prov:wasDerivedFrom | |
| schema:isPartOf |