bc-ontologyGovernments, institutions, geography and law
Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.

source excerpt from https://nab.gov.pk/wp-content/uploads/2026/08/THE-PAKISTAN-PENAL-CODE.pdf

https://ontology.bommaritollc.com/id/01a137f0-d0a8-7138-97c8-39ceebce861e
oa:SpecificResource
Download TurtleJSON-LDN-TriplesMarkdown
Cite this
source excerpt from https://nab.gov.pk/wp-content/uploads/2026/08/THE-PAKISTAN-PENAL-CODE.pdf. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a137f0-d0a8-7138-97c8-39ceebce861e

Elsewhere

Facts

adms:identifier
oa:bodyValue
{"legal_state":"unknown","passage":{"end_byte":454354,"instrument_iri":"https://ontology.bommaritollc.com/id/01a137ed-2b28-75f9-a0b6-0e18b564ea67","original_sha256":"e2cd2bb931cccca0425cbbbb70f362f456c1619aa94e563415a97ee9a8876fa1","parsed_text_sha256":"15d758aa00c725f0c7e98d0ec0fdc107e1efb43b598dc82fe0747c8a9b8eec32","source_url":"https://nab.gov.pk/wp-content/uploads/2026/08/THE-PAKISTAN-PENAL-CODE.pdf","start_byte":442381},"policy":"retained-legal-source-passage-v1","quote":"(g) \"electric power\" means electrical energy or the capacity for the production of\n\nelectrical power;\n\n(h) \"electric power services\" means the generation, transmission or distribution of\n\nelectric p power and all other services incidental thereto;\n\n(i) \"energy\" means electrical energy when generated, transmitted, distributed,\n\nsupplied or used for any purpose;\n\n(j) \"Government\" means the Federal Government;\n\n1Ins. by Act No. VI of 2016, s.2.\n\nPage 157 of 179\n\ntransmission facilities for transmission of electric power, is said to cause\n\nwillfully tampers or attempts to tamper with service line, electric supply-line or\n\nto abstract, use or consume electricity without passing through the electric meter\n\nservices, or any other related system and equipment, as the case may be, so as\n\ntransmission facilities of a licensee for transmission of electric power\n\nunderground or under water lines or cables, or services lines, electric supply-line\n\ndishonestly taps, makes or causes to be made any connection with overhead,\n\n462H. Abstraction or tampering etc. with transmission.\n\n\"works\" includes electric supply-lines and any buildings, machinery or\n\nelectrical circuits, transformers and sub-stations operating at or above the\n\n\"transmission\" means the ownership, operation, management or control of\n\npower, transmission, inter-connection, distribution services and sales of electric\n\n\"tariff\" means the rates, charges terms and condition for generation of electr\n\ntransmission line or distribution line or interfering with its original condition;\n\nor destructing the same or in any manner interfering with the electric meter or\n\nor transmission and distribution lines either by breaking the seals o\n\nmetering of electric power by unauthorized entry of access into metering system\n\n\"tampering\" or \"tamper\" includes interfering or creating hindrance in flow or\n\nfrom a distributing main to a group of consumers on the same premises\n\nto a single consumer either from a distributing main or immediately from\n\n\"service line\" means any electric supply-line through which energy is, or is\n\nincorporated or not, or public servant or an employee of any, company, licensee\n\nunder the Regulation of Generation, Transmission and Distribution of Electric\n\n(k)\n\n(l)\n\n(m)\n\n(n)\n\n(o)\n\n(p)\n\n(q)\n\n(r)\n\n(s)\n\n(a)\n\n(b)\n\n\"licen\n\nPower Act, 1997 (XL of 1997);\n\n\"licence\" means a holder of a licence;\n\n\"person\" includes any individual or any company, firm or cooperation whether\n\nor electric power utility;\n\nintended to be, supplied by a licensee,—\n\n(i)\n\nthe licensee's premises; or\n\n(ii)\n\nof on adjoining premises supplied from the same point of the distributing\n\nmain;\n\nr damaging\n\nic\n\npower to consumers by a licensee;\n\ntransmission facilities;\n\n\"transmission facilities\" means electrical transmission facilities including\n\nminimum transmission voltage; and\n\napparatus required to supply energy.\n\n— (1) Any person who,—\n\nor\n\nis said to cause abstraction; or\n\ntampering.\n\nPage 158 of 179\n\nce\" means a licence issued for generation, transmission or distribution\n\n(2) Any person who causes or abets in causing abstraction or commits o or abet in committing\n\ntampering with transmission of electric power for the purpose of,—\n\n(a) theft of electric power; or\n\n(b) disrupting supply of electric power; or\n\n(c) illegal transmission of electric power services,\n\nshall be punishable with rigorous imprisonment which may extend to three years or with fine\n\nwhich may extend to ten million rupees or with both.\n\n462 I. Abstraction or tampering etc., with distribution or auxiliary.__ (1) Any person\n\nwho,__\n\n(a) dishonestly taps, makes or causes to be made any connection with overhead,\n\nunderground or under water lines or cables, or service lines, electric supply-line\n\nor distribution facilities of a licensee for distribution of electric power services\n\nso as to abstract, use or consumer electricity without passing through the electric\n\nmeter is said to cause abstraction; or\n\n(b) willfully tampers or attempts to tamper with service line, electric supply-line or\n\ndistribution facilities for distribution of electric power services, or any other\n\nrelated system and equipment, as the case may be, for distribution of electric\n\npower services is said to cause tampering with auxiliary or distribution of\n\nelectric power.\n\n(2) Any person who causes or abets in causing abstraction or commits or abets in\n\ncommitting tampering with distribution of electric power for the purpose of,—\n\n(a) theft of electric power; or\n\n(b) disrupting supply of electric power; or\n\n(c) illegal distribution of electric power services,\n\nshall be punishable with rigorous imprisonment which may extend to three years or with fine\n\nwhich may extend to three million rupees or with both.\n\n462J. Interference, improper use or tampering with electric meter by domestic consumer,\n\netc.__ Any person being the domestic consumer who,__\n\n(a) unauthorizedly connects any electric meter with any electric line through which\n\nelectricity is supplied by a licensee or disconnects the same from any such\n\nelectric line without the consent of the licensee; or\n\n(b) unauthorizedly reconnects any electric meter with any electric line or other\n\nworks being the property of a licensee when the said electric line or other works\n\nhas or have been cut or disconnected without the consent of the licensee; or\n\nPage 159 of 179\n\n(c) tampers with an electric meter, install or uses a tampered electric meter, current\n\nreversing transformer, loop connection or any other device or method,\n\ncontrivance or artificial means which interferes with accurate or proper\n\nregistration, calibration or metering of electric current or otherwise results in a\n\nmanner whereby electricity is stolen or wasted; or\n\n(d) uses the energy supplied by a licensee under one method of tariff in a manner\n\nfor which higher tariff is in force; or\n\n(e) uses energy supplied by a licensee in a manner prejudicial to the safety or\n\nefficient working of the electric supply-line or deals with it in a manner so as to\n\ninterfere with efficient supply of energy to other consumers, or persons; or\n\n(f) abets in the commission or any of the acts mentioned in clauses (a) to (e),\n\nin order to commit theft of electric power, or dishonestly abstract, consume or use electric\n\npower or unauthorized distribution or supply of electric power shall be punishable with\n\nimprisonment for a term which may be extend to two years or with fine which may extend to\n\none million rupees or with both.\n\n462K. Interference, improper use of tampering with electric meter by industrial or\n\ncommercial, etc.— Any person being industrial or commercial who,__\n\n(a) unauthorizedly connects any electric meter with any electric line through which\n\nelectricity its supplied by a licensee or disconnects the same from any such\n\nelectric line without the consent of the licensee; or\n\n(b) unauthorizedly reconnects any electric meter with any electric line or other\n\nworks being the property of a licensee when the said electric line or other works\n\nhas or have been cut or disconnected without the consent of the licensee; or\n\n(c) tampers with an electric meter, installs or uses a tampered meter, current\n\nreversing transformer, loop connection or any other device or method,\n\ncontrivance or artificial means which interferes with accurate or proper\n\nregistration, calibration or metering of electric current or otherwise results in a\n\nmanner whereby electricity is stolen or wasted; or\n\n(d) uses the energy supplied by a licensee under one method of tariff in a manner\n\nfor which higher tariff is in force; or\n\n(e) lays, or causes to be laid, or connects up any works for the purpose of\n\ncommunicating with any other works belonging to a licensee without consent;\n\nor\n\n(f) uses energy supplied by a licensee in a manner prejudicial to the safety or\n\nefficient working of the electric supply-line or deals with it in a manner so as to\n\ninterfere with efficient supply of energy to other consumers, persons; or\n\n(g) abets in the commission of any of the acts mentioned in clauses (a) to (f),\n\nin order to commit theft of electric power, or dishonestly abstract, consume or use electric\n\npower or unauthorized distribution or supply of electric power shall be punished with\n\nPage 160 of 179\n\nimprisonment which may extend to three years or with fine which may extend to six million\n\nrupees or with both.\n\n462L. Interference, improper use or tempering with electric meter by agricultural\n\nconsumer, etc.__ Any person being agricultural consumer who,__\n\n(a) unauthorizedly connects any electric meter with any electric line through which\n\nelectricity is supplied by a licensee disconnects the same from any such electric\n\nline without the consent of the licensee; or\n\n(b) unauthorizedly reconnects any electric meter with any electric line or other\n\nworks being the property of a licensee when the said electric line or other works\n\nhas or have been cut or disconnected without the consent of the licensee; or\n\n(c) tampers with an electric meter, install or uses a tampered meter, current\n\nreversing transformer, loop connection or any other device or method,\n\ncontrivance or artificial means which interferes with accurate or proper\n\nregistration, calibration or metering of electric current or otherwise results in a\n\nmanner whereby electricity is stolen or wasted; or\n\n(d) uses the energy supplied by a licensee under one method of tariff in a manner\n\nfor which higher tariff is in force; or\n\n(e) lays, or causes to be laid, or connects up any works for the purpose of\n\ncommunicating with any other works belonging to a licensee without consent;\n\nor\n\n(f) uses energy supplied by a licensee in a manner prejudicial to the safety or\n\nefficient working of the electric supply-line or deals with in a manner so as to\n\ninterfere with efficient supply of energy to other consumers, persons; or\n\n(g) abets in the commission of any of the act mentioned in clauses (a) to (f),\n\nin order to commit theft of electric power, or dishonestly abstract, consume or use electric\n\npower or unauthorized distribution or supply of electric power shall be punished with\n\nimprisonment which may extend to two years or with fine which may extend to two and half\n\nmillion rupees or with both.\n\n462M. Damaging or destroying or destructing the transmission lines, distribution\n\nlines, electric meter etc.__ Any person who damages, destroys or destruct any transmission lines,\n\ndistribution lines, electric meter, apparatus, equipment, or wire or causes or allows any of them to be\n\nso damaged, destroyed or destructed by an act of subversion by explosive material or in any other\n\nmanner so as to disrupt the supply of electric power services or maliciously causes electric power\n\nservices to b be wasted or diverted or cuts off or injures or attempts to cut off or injure any transmission\n\nline or distribution line or a service line or electric supply line shall be punished with rigorous\n\nimprisonment which may extend to seven years and with fine which shall not be less than three million\n\nrupees.\n\n462N. Recovery of outstanding amounts from persons involved in section 462H\n\nto 462M offences.__ Any person said to commit or to have committed the offence as mentioned\n\nin section 462H to 462M shall also be liable to pay an amount equivalent to the financial loss caused\n\nto the Government or the distribution companies concerned. Any such outstanding amount of penalties\n\nPage 161 of 179\n\nor fines imposed under this Chapter shall be recoverable as arrears of land revenue.\n\n462O. Cognizance.__ (1) The Court shall try an offence punishable under this Chapter.\n\n(2) Notwithstanding anything contained in the Code of Criminal Procedure, 1898 or any other\n\nlaw for the time being in force, the Court shall not take cognizance of an offence under this Chapter except\n\non a complaint made, with reasons to be recorded in writing along with full particulars of the offences\n\n","statutory_number":null,"whole_instrument_recall":"not_established"}rdf:JSON
oa:hasSource
prov:wasDerivedFrom
schema:isPartOf

Related

Errata in its text (1)oa:hasTarget