bc-ontologyGovernments, institutions, geography and law
Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.

source excerpt from https://www.revisor.mn.gov/bills/94/2026/0/SF/5052/versions/1/pdf/

https://ontology.bommaritollc.com/id/01a138e7-b41e-7753-a7cb-9bc0e2cbd7be
oa:SpecificResource
Download TurtleJSON-LDN-TriplesMarkdown
Cite this
source excerpt from https://www.revisor.mn.gov/bills/94/2026/0/SF/5052/versions/1/pdf/. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a138e7-b41e-7753-a7cb-9bc0e2cbd7be

Elsewhere

Facts

adms:identifier
oa:bodyValue
{"legal_state":"unknown","passage":{"end_byte":585850,"instrument_iri":"https://ontology.bommaritollc.com/id/01a138da-412d-70c1-b36c-89389fe396c3","original_sha256":"1181df33a98813b51b5570f1988509d92906afc8c5d35b4fc04525eea8e1e58a","parsed_text_sha256":"a027469b4451cd5f8d2410d83f6fa2ac4b11fac752cc383cbd6b31adc27bae52","source_url":"https://www.revisor.mn.gov/bills/94/2026/0/SF/5052/versions/1/pdf/","start_byte":573895},"policy":"retained-legal-source-passage-v1","quote":"\n(6) any other information required by the commissioner.\n\n469.312 JOB OPPORTRTUNITY BUILDING ZONES; LIMITATATATIONS.\n\n\nSubdivision 1. Maximum size. A job opportunity building zone may not exceed 5,000 acres.\n\n\nFor a zone designated as an agricultural processing facility zone, the zone also may not exceed the\n\nsize of a site necessary for the agricultural processing facility, y, including ancillary operations and\n\nspace for expansion in the reasonably foreseeable future. For a zone designated as a create automotive\n\nrecovery zone, the zone also may not exceed the size of the site necessary for the assembly of motor\n\nvehicles, including ancillary operations and space for expansion in the reasonably foreseeable future.\n\nSubd. 2. Subzones. The area of a job opportunity building zone may consist of one or more\n\n\nnoncontiguous areas or subzones.\n\nSubd. 3. Outside metropolitan area. Except for a create automotive recovery zone, the area\n\n\nof a job opportunity building zone must be located outside of the metropolitan area, as defined in\n\nsection 473.121, subdivision 2.\n\nSubd. 4. Border city development zones. (a) The area of a job opportunity building zone may\n\n\nnot include the area of a border city development zone designated under section 469.1731. The city\n\nmay remove property from a border city development zone contingent upon the area being designated\n\nas a job opportunity building zone. Before removing a parcel of property from a border city\n\ndevelopment zone, the city must obtain the written consent to the removal from each recipient that\n\nis located on the parcel and receives incentives under the border city development zone. Consent\n\nof any other property owner or taxpayer in the border city development zone is not required.\n\n(b) A city may not provide tax incentives under section 469.1734 to individuals or businesses\n\nfor operations or activity in a job opportunity building zone.\n\nSubd. 5. Duration limit. (a) The maximum duration of a zone is 12 years. The applicant may\n\n\nrequest a shorter duration. The commissioner may specify a shorter duration, regardless of the\n\nrequested duration.\n\n(b) The duration limit under this subdivision and the duration of the zone for purposes of\n\nallowance of tax incentives described in section 469.315 is extended by three calendar years for\n\neach parcel of property that meets the following requirements:\n\n(1) the qualified business operates an ethanol plant, as defined in section 41A.09, on the site\n\nthat includes the parcel; and\n\n(2) the business subsidy agreement was executed after April 30, 2006.\n\n8R\n\nAPPENDIX\n\n\nRepealed Minnesota Statutes: S5052-1\n\n(c) The duration limit under this subdivision and the duration of the zone for purposes of\n\nallowance of tax incentives described in section 469.315 is extended by five calendar yearsfor each\n\nparcel of property that meets the following requirements:\n\n(1) the parcel is located in a county with an unemployment rate that on the date that the business\n\nsubsidy agreement is executed (i) equals or exceeds ten percent or (ii) is ten percent higher than\n\nthe statewide average;\n\n(2) the operations of the qualified business on the site include:\n\n(i) its headquarters;\n\n(ii) facilities for research and development; and\n\n(iii) the manufacturing of products, used by the building, transport, consumer products, and\n\nindustrial products sectors, that reduce the use of or increase the efffficiency of the use of energy\n\nresources and that are manufactured using innovative and high technology processes; and\n\n(3) the business subsidy agreement is executed after July 1, 2009, and before July 1, 2011.\n\n(d) The duration of a create automotive recovery zone is 12 yearsfrom the date of the designation\n\nof a zone by the commissioner under section 469.314, subdivision 4, paragraph (g).\n\n(e) The duration limit under this subdivision and the duration of the zone for purposes of\n\nallowance of tax incentives described in section 469.315 is extended by five calendar yearsfor each\n\nparcel of property that meets the following requirements:\n\n(1) the parcel is located in a county with an unemployment rate for any of the 12 months\n\npreceding the date on which the business subsidy agreement is executed that (i) equals or exceeds\n\nten percent or (ii) is ten percent higher than the statewide average;\n\n(2) the qualified business is engaged in the business of manufacturing wind turbines and related\n\nproducts for the generation of energy, y, and the parcel includes one or more of the following facilities\n\nof the qualified business:\n\n(i) the headquarters of the business in this country;\n\n(ii) training facilities; or\n\n(iii) manufacturing facilities; and\n\n(3) the initial business subsidy agreement is executed after July 1, 2010, and before November\n\n1, 2011.\n\n469.313 APPLICATATION FOR DESIGNATATION.\n\n\nSubdivision 1. Who may apply. y. One or more local government units, or a joint powers board\n\n\nunder section 471.59, acting on behalf of two or more units, may apply for designation of an area\n\nas a job opportunity building zone. All or part of the area proposed for designation as a zone must\n\nbe located within the boundaries of each of the governmental units. A local government unit may\n\nnot submit or have submitted on its behalf more than one application for designation of a job\n\nopportunity building zone.\n\nSubd. 2. Application content. The application must include:\n\n\n(1) a development plan meeting the requirements of section 469.311;\n\n(2) the proposed duration of the zone, not to exceed 12 years;\n\n(3) a resolution or ordinance adopted by each of the cities or towns and the counties in which\n\nthe zone is located, agreeing to provide all of the local tax exemptions provided under section\n\n469.315;\n\n(4) if the proposed zone includes area in a border city development zone, written consent to\n\nremoval of the property from the border city development zone to the extent required by section\n\n469.312, subdivision 4;\n\n(5) an agreement by the applicant to treat incentives provided under the zone designation as\n\nbusiness subsidies under sections 116J.993 to 116J.995 and to comply with the requirements of\n\nthat law; and\n\n(6) supporting evidence to allow the commissioner to evaluate the application under the criteria\n\nin section 469.314.\n\n9R\n\nAPPENDIX\n\n\nRepealed Minnesota Statutes: S5052-1\n\n469.314 DESIGNATATION OF JOB OPPORTRTUNITY BUILDING ZONES.\n\n\nSubdivision 1. Commissioner to designate. (a) The commissioner, in consultation with the\n\n\ncommissioner of revenue, shall designate not more than ten job opportunity building zones and not\n\nmore than one create automotive recovery zone. In making the designations, the commissionershall\n\nconsider need and likelihood of success to yield the most economic development and revitalization\n\nof economically distressed rural areas of Minnesota.\n\n(b) In addition to the designations under paragraph (a), the commissioner may, y, in consultation\n\nwith the commissioners of agriculture and revenue, designate up to five agricultural processing\n\nfacility zones.\n\n(c) The commissioner may, y, upon designation of a zone, modify the development plan, including\n\nthe boundaries of the zone or subzones, if in the commissioner's opinion a modified plan would\n\nbetter meet the objectives of the job opportunity building zone program. The commissioner shall\n\nnotify the applicant of the modification and provide a statement of the reasons for the modifications.\n\nSubd. 2. Need indicators. (a) In evaluating applications to determine the need for designation\n\n\nof a job opportunity building zone, the commissionershall consider the following factors asindicators\n\nof need:\n\n(1) the percentage of the population that is below 200 percent of the poverty rate, compared\n\nwith the state as a whole;\n\n(2) the extent to which the area's average weekly wage is significantly lower than the state\n\naverage weekly wage;\n\n(3) the amount of property in or near the proposed zone that is deteriorated or underutilized;\n\n(4) the extent to which the median sale price of housing units in the area is below the state\n\nmedian;\n\n(5) the extent to which the median household income of the area is lower than the state median\n\nhousehold income;\n\n(6) the extent to which the area experienced a population loss during the 20-year period ending\n\nthe year before the application is made;\n\n(7) the extent to which an area has experienced sudden or severe job loss as a result of closing\n\nof businesses or other employers;\n\n(8) the extent to which property in the area would remain underdeveloped or nonperforming\n\ndue to physical characteristics;\n\n(9) the extent to which the area has substantial real property with adequate infrastructure and\n\nenergy to support new or expanded development; and\n\n(10) the extent to which the business startup or expansion rates are significantly lower than the\n\nrespective rate for the state.\n\n(b) In applying the need indicators, the best available data should be used. If reported data are\n\nnot available for the proposed zone, data for the smallest area that is available and includes the area\n\nof the proposed zone may be used. The commissioner may require applicants to provide data to\n\ndemonstrate how the area meets one or more of the indicators of need.\n\nSubd. 3. Success indicators. In determining the likelihood of success of a proposed zone, the\n\n\ncommissioner shall consider:\n\n(1) the strength and viability of the proposed development goals, objectives, and strategies in\n\nthe development plan;\n\n(2) whether the development plan is creative and innovative in comparison to other applications;\n\n(3) local public and private commitment to development of the proposed zone and the potential\n\ncooperation of surrounding communities;\n\n(4) existing resources available to the proposed zone;\n\n(5) how the designation of the zone would relate to other economic and community development\n\nprojects and to regional initiatives or programs;\n\n(6) how the regulatory burden will be eased for businesses operating in the proposed zone;\n\n10R\n\nAPPENDIX\n\n\nRepealed Minnesota Statutes: S5052-1\n\n(7) proposals to establish and link job creation and job training; and\n\n(8) the extent to which the development is directed at encouraging and that designation of the\n\nzone is likely to result in the creation of high-paying jobs.\n\nSubd. 4. Designation schedule. (a) The schedule in paragraphs (b) to (f) applies to the\n\n\ndesignation of job opportunity building zones. Paragraph (g) applies to the designation of a create\n\nautomotive recovery zone.\n\n(b) The commissioner shall publish the form for applications and any procedural, form, or\n\ncontent requirements for applications by no later than August 1, 2003. The commissioner may\n\npublish these requirements on the Internet, in the State Register, or by any other means the\n\ncommissioner determines appropriate to disseminate the information to potential applicants for\n\ndesignation.\n\n(c) Applications must be submitted by October 15, 2003.\n\n(d) The commissioner shall designate the zones by no later than December 31, 2003.\n\n(e) The designation of the zones takes effffect January 1, 2004.\n\n(f) The commissioner may reserve one or more of the ten authorized zones for a second round\n\nof designations in calendar year 2004. If the commissioner chooses to reserve designations for this\n\npurpose, the commissioner shall establish the schedule for the second round of designations,\n\nnotwithstanding the dates in paragraphs (c), (d), and (e). The commissioner shall allow a period of\n\nat least 90 days for submission of applications after notification of the second round. A zone\n\ndesignated in the second round takes effffect on January 1, 2005.\n\n(g) The commissioner may accept applications for a create automotive recovery zone at any\n\ntime before January 1, 2016. The commissioner may designate a create automotive recovery zone\n\nat any time after December 31, 2011, and before January 1, 2016, but only if the applicant has\n\n","statutory_number":null,"whole_instrument_recall":"not_established"}rdf:JSON
oa:hasSource
prov:wasDerivedFrom
schema:isPartOf

Related

Errata in its text (5)oa:hasTarget