49 CFR 195.3 What documents are incorporated by reference partly or wholly in this part?
49 CFR 195.3 What documents are incorporated by reference partly or wholly in this part?, “What documents are incorporated by reference partly or wholly in this part?”, is a CFR section of 49 CFR Part 195, Subpart A—General; in force.
https://ontology.bommaritollc.com/id/01a0ee02-62bb-7569-a724-063e7f234c9f
Elsewhere
Facts
| adms:identifier | |
| eli:cites | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 49 CFR 195.3 |
| schema:legislationJurisdiction | |
| schema:legislationLegalForce | |
| schema:legislationType | |
| schema:name | What documents are incorporated by reference partly or wholly in this part?en |
| schema:url | |
| skos:prefLabel | 49 CFR 195.3 What documents are incorporated by reference partly or wholly in this part?en |
Related
Cited by (31)eli:cites
- 49 CFR 195.101 Qualifying metallic components other than pipe.
- 49 CFR 195.106 Internal design pressure.
- 49 CFR 195.116 Valves.
- 49 CFR 195.118 Fittings.
- 49 CFR 195.120 Passage of internal inspection devices.
- 49 CFR 195.124 Closures.
- 49 CFR 195.132 Design and construction of aboveground breakout tanks.
- 49 CFR 195.134 Leak detection.
- 49 CFR 195.205 Repair, alteration and reconstruction of aboveground breakout tanks that have been in service.
- 49 CFR 195.207 Transportation of pipe.
- 49 CFR 195.214 Welding procedures.
- 49 CFR 195.222 Welders and welding operators: Qualification of welders and welding operators.
- 49 CFR 195.228 Welds and welding inspection: Standards of acceptability.
- 49 CFR 195.264 Impoundment, protection against entry, normal/emergency venting or pressure/vacuum relief for aboveground breakout tanks.
- 49 CFR 195.307 Pressure testing aboveground breakout tanks.
- 49 CFR 195.405 Protection against ignitions and safe access/egress involving floating roofs.
- 49 CFR 195.406 Maximum operating pressure.
- 49 CFR 195.428 Overpressure safety devices and overfill protection systems.
- 49 CFR 195.432 Inspection of in-service breakout tanks.
- 49 CFR 195.440 Public awareness.
- 49 CFR 195.444 Leak detection.
- 49 CFR 195.446 Control room management.
- 49 CFR 195.452 Pipeline integrity management in high consequence areas.
- 49 CFR 195.5 Conversion to service subject to this part.
- 49 CFR 195.565 How do I install cathodic protection on breakout tanks?
- 49 CFR 195.571 What criteria must I use to determine the adequacy of cathodic protection?
- 49 CFR 195.573 What must I do to monitor external corrosion control?
- 49 CFR 195.579 What must I do to mitigate internal corrosion?
- 49 CFR 195.587 What methods are available to determine the strength of corroded pipe?
- 49 CFR 195.588 What standards apply to direct assessment?