Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
30 CFR 250.125 Service fees.
30 CFR 250.125 Service fees., “Service fees”, is a CFR section of 30 CFR Part 250, Subpart A, Subject Group: Fees—Fees; in force.
https://ontology.bommaritollc.com/id/01a0f09e-0cc5-73b6-b31f-2b80de9b8fb7
Elsewhere
Facts
| adms:identifier | |
| eli:cites | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 30 CFR 250.125 |
| schema:legislationJurisdiction | |
| schema:legislationLegalForce | |
| schema:legislationType | |
| schema:name | Service feesen |
| schema:url | |
| skos:prefLabel | 30 CFR 250.125 Service fees.en |
Related
Cited by (31)eli:cites
- 30 CFR 250.1000 General requirements.
- 30 CFR 250.1008 Reports.
- 30 CFR 250.1015 Applications for pipeline right-of-way grants.
- 30 CFR 250.1018 Assignment of pipeline right-of-way grants.
- 30 CFR 250.1156 What steps must I take to receive approval to produce within 500 feet of a unit or lease line?
- 30 CFR 250.1157 How do I receive approval to produce gas-cap gas from an oil reservoir with an associated gas cap?
- 30 CFR 250.1158 How do I receive approval to downhole commingle hydrocarbons?
- 30 CFR 250.1167 What information must I submit with forms and for approvals?
- 30 CFR 250.1202 Liquid hydrocarbon measurement.
- 30 CFR 250.1203 Gas measurement.
- 30 CFR 250.1204 Surface commingling.
- 30 CFR 250.1303 How do I apply for voluntary unitization?
- 30 CFR 250.1617 Application for permit to drill.
- 30 CFR 250.1618 Application for permit to modify.
- 30 CFR 250.1704 What decommissioning applications and reports must I submit and when must I submit them?
- 30 CFR 250.171 How do I request a suspension?
- 30 CFR 250.1727 What information must I include in my final application to remove a platform or other facility?
- 30 CFR 250.1751 How do I decommission a pipeline in place?
- 30 CFR 250.1752 How do I remove a pipeline?
- 30 CFR 250.198 Documents incorporated by reference.
- 30 CFR 250.227 What must the Project Conceptual Plan contain?
- 30 CFR 250.228 What must the New or Unusual Technology Conceptual Plan contain?
- 30 CFR 250.229 What must the New or Unusual Technology Barrier Equipment Conceptual Plan include?
- 30 CFR 250.237 What general information must my DWOP include?
- 30 CFR 250.248 What information must I include in my Supplemental DWOP?
- 30 CFR 250.410 How do I obtain approval to drill a well?
- 30 CFR 250.465 When must I submit an Application for Permit to Modify (APM) or an End of Operations Report to BSEE?
- 30 CFR 250.513 Approval and reporting of well-completion operations.
- 30 CFR 250.613 Approval and reporting for well-workover operations.
- 30 CFR 250.842 Approval of safety systems design and installation features.