Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
30 CFR 285.709 When conducting onsite fabrication inspections, what must the CVA or project engineer verify?
30 CFR 285.709 When conducting onsite fabrication inspections, what must the CVA or project engineer verify?, “When conducting onsite fabrication inspections, what must the CVA or project engineer verify?”, is a CFR section of 30 CFR Part 285, Subpart G, Subject Group: Certified Verification Agent—Certified Verification Agent; in force.
https://ontology.bommaritollc.com/id/01a0f09e-1042-74ff-93e8-d38223f59df8
Elsewhere
Facts
| adms:identifier | |
| eli:cites | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 30 CFR 285.709 |
| schema:legislationJurisdiction | |
| schema:legislationLegalForce | |
| schema:legislationType | |
| schema:name | When conducting onsite fabrication inspections, what must the CVA or project engineer verify?en |
| schema:url | |
| skos:prefLabel | 30 CFR 285.709 When conducting onsite fabrication inspections, what must the CVA or project engineer verify?en |