Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
33 CFR Part 157, Subpart B—Design, Equipment, and Installation
33 CFR Part 157, Subpart B—Design, Equipment, and Installation, “Design, Equipment, and Installation”, is a CFR division of 33 CFR Part 157—Rules for the protection of the marine environment relating to tank vessels carrying oil in bulk.
https://ontology.bommaritollc.com/id/01a0f0a2-be6c-735c-8fd8-4394fee75f1f
Elsewhere
Facts
| adms:identifier | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 33 CFR Part 157, Subpart B |
| schema:legislationJurisdiction | |
| schema:legislationType | |
| schema:name | Design, Equipment, and Installationen |
| skos:prefLabel | 33 CFR Part 157, Subpart B—Design, Equipment, and Installationen |
Related
Parts (27)schema:isPartOf
- 33 CFR 157.08 Applicability of subpart B.
- 33 CFR 157.09 Segregated ballast.
- 33 CFR 157.10 Segregated ballast tanks and crude oil washing systems for certain new vessels.
- 33 CFR 157.10a Segregated ballast tanks, crude oil washing systems, and dedicated clean ballast tanks for certain new and existing vessels of 40,000 DWT or more.
- 33 CFR 157.10b Segregated ballast tanks, dedicated clean ballast tanks, and special ballast arrangements for tank vessels transporting Outer Continental Shelf oil.
- 33 CFR 157.10c Segregated ballast tanks, crude oil washing systems, and dedicated clean ballast tanks for certain new and existing tankships of 20,000 to 40,000 DWT.
- 33 CFR 157.10d Double hulls on tank vessels.
- 33 CFR 157.11 Pumping, piping and discharge arrangements.
- 33 CFR 157.12 Oil discharge monitoring and control system.
- 33 CFR 157.12a Definitions.
- 33 CFR 157.12b Implementation requirements.
- 33 CFR 157.12c Construction, maintenance, security, calibration, and training.
- 33 CFR 157.12d Technical specifications.
- 33 CFR 157.12e Certificate of approval.
- 33 CFR 157.12f Workshop functional test requirements.
- 33 CFR 157.12g Plan approval requirements.
- 33 CFR 157.13 Designated observation area.
- 33 CFR 157.14 Pump-room bottom protection.
- 33 CFR 157.15 Slop tanks in tank vessels.
- 33 CFR 157.17 Oil residue (sludge) tank.
- 33 CFR 157.19 Cargo tank arrangement and size.
- 33 CFR 157.20 Accidental oil outflow performance.
- 33 CFR 157.21 Subdivision and stability.
- 33 CFR 157.22 Intact stability requirements.
- 33 CFR 157.23 Cargo and ballast system information.
- 33 CFR 157.24 Submission of calculations, plans, and specifications.
- 33 CFR 157.24a Submission of calculations, plans, and specifications for existing vessels installing segregated ballast tanks.