Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
40 CFR 60.58b Compliance and performance testing.
40 CFR 60.58b Compliance and performance testing., “Compliance and performance testing”, is a CFR section of 40 CFR Part 60, Subpart Eb—Standards of Performance for Large Municipal Waste Combustors for Which Construction is Commenced After September 20, 1994 or for Which Modification or Reconstruction is Commenced After June 19, 1996; in force.
https://ontology.bommaritollc.com/id/01a0f0af-e60f-72cf-a324-18d723aca399
Elsewhere
Facts
| adms:identifier | |
| eli:cites | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 40 CFR 60.58b |
| schema:legislationJurisdiction | |
| schema:legislationLegalForce | |
| schema:legislationType | |
| schema:name | Compliance and performance testingen |
| schema:url | |
| skos:prefLabel | 40 CFR 60.58b Compliance and performance testing.en |
Related
Cited by (35)eli:cites
- 40 CFR 52.46 What are the requirements of the Federal Implementation Plans (FIPs) relating to ozone season emissions of nitrogen oxides from Municipal Waste Combustors?
- 40 CFR 60.17 Incorporations by reference.
- 40 CFR 60.2165 What monitoring equipment must I install and what parameters must I monitor?
- 40 CFR 60.2730 What monitoring equipment must I install and what parameters must I monitor?
- 40 CFR 60.33b Emission guidelines for municipal waste combustor metals, acid gases, organics, and nitrogen oxides.
- 40 CFR 60.38b Compliance and performance testing.
- 40 CFR 60.45 Emissions and fuel monitoring.
- 40 CFR 60.47c Emission monitoring for particulate matter.
- 40 CFR 60.4865 How and when do I demonstrate initial compliance with the emission limits and standards?
- 40 CFR 60.4880 How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection, and ash handling systems, and by what date must I conduct an initial performance evaluation?
- 40 CFR 60.4885 How and when do I demonstrate continuous compliance with the emission limits and standards?
- 40 CFR 60.48b Emission monitoring for particulate matter and nitrogen oxides.
- 40 CFR 60.4900 What are the performance testing, monitoring, and calibration requirements for compliance with the emission limits and standards?
- 40 CFR 60.49Da Emission monitoring.
- 40 CFR 60.50b Applicability and delegation of authority.
- 40 CFR 60.5185 How and when do I demonstrate initial compliance with the emission limits and standards?
- 40 CFR 60.51b Definitions.
- 40 CFR 60.5200 How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection, and ash handling systems, and by what date must I conduct an initial performance evaluation?
- 40 CFR 60.5205 How and when do I demonstrate continuous compliance with the emission limits and standards?
- 40 CFR 60.5220 What are the performance testing, monitoring, and calibration requirements for compliance with the emission limits and standards?
- 40 CFR 60.52b Standards for municipal waste combustor metals, acid gases, organics, and nitrogen oxides.
- 40 CFR 60.53b Standards for municipal waste combustor operating practices.
- 40 CFR 60.55b Standards for municipal waste combustor fugitive ash emissions.
- 40 CFR 60.56c Compliance and performance testing.
- 40 CFR 60.59b Reporting and recordkeeping requirements.
- 40 CFR 62.14101 Definitions.
- 40 CFR 62.14106 Emission limits for municipal waste combustor fugitive ash emissions.
- 40 CFR 62.14109 Reporting and recordkeeping and compliance and performance testing.
- 40 CFR 62.14452 What test methods and procedures must I use?
- 40 CFR 62.14665a What monitoring equipment must I install and what parameters must I monitor?
5 more
- 40 CFR 62.15980 How and when do I demonstrate initial compliance with the emission limits and standards?
- 40 CFR 62.15995 How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection, and ash handling systems, and by what date must I conduct an initial performance evaluation?
- 40 CFR 62.16000 How and when do I demonstrate continuous compliance with the emission limits and standards?
- 40 CFR 62.16015 What are the performance testing, monitoring, and calibration requirements for compliance with the emission limits and standards?
- 40 CFR 98.6 Definitions.