Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
40 CFR 60.13 Monitoring requirements.
40 CFR 60.13 Monitoring requirements., “Monitoring requirements”, is a CFR section of 40 CFR Part 60, Subpart A—General Provisions; in force.
https://ontology.bommaritollc.com/id/01a0f0af-e52a-70d6-acdb-018482e2192d
Elsewhere
Facts
| adms:identifier | |
| eli:cites | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 40 CFR 60.13 |
| schema:legislationJurisdiction | |
| schema:legislationLegalForce | |
| schema:legislationType | |
| schema:name | Monitoring requirementsen |
| schema:url | |
| skos:prefLabel | 40 CFR 60.13 Monitoring requirements.en |
Related
Cited by (125)eli:cites
- 40 CFR 52.145 Visibility protection.
- 40 CFR 52.41 What are the requirements of the Federal Implementation Plans (FIPs) relating to ozone season emissions of nitrogen oxides from the Pipeline Transportation of Natural Gas Industry?
- 40 CFR 52.42 What are the requirements of the Federal Implementation Plans (FIPs) relating to ozone season emissions of nitrogen oxides from the Cement and Concrete Product Manufacturing Industry?
- 40 CFR 52.43 What are the requirements of the Federal Implementation Plans (FIPs) relating to ozone season emissions of nitrogen oxides from the Iron and Steel Mills and Ferroalloy Manufacturing Industry?
- 40 CFR 52.44 What are the requirements of the Federal Implementation Plans (FIPs) relating to ozone season emissions of nitrogen oxides from the Glass and Glass Product Manufacturing Industry?
- 40 CFR 52.45 What are the requirements of the Federal Implementation Plans (FIPs) relating to ozone season emissions of nitrogen oxides from the Basic Chemical Manufacturing, Petroleum and Coal Products Manufacturing, the Pulp, Paper, and Paperboard Mills Industries, Metal Ore Mining, and the Iron and Steel and Ferroalloy Manufacturing Industries?
- 40 CFR 52.46 What are the requirements of the Federal Implementation Plans (FIPs) relating to ozone season emissions of nitrogen oxides from Municipal Waste Combustors?
- 40 CFR 52.675 Control strategy: Sulfur oxides—Eastern Idaho Intrastate Air Quality Control Region.
- 40 CFR 60.105 Monitoring of emissions and operations.
- 40 CFR 60.105a Monitoring of emissions and operations for fluid catalytic cracking units (FCCU) and fluid coking units (FCU).
- 40 CFR 60.106 Test methods and procedures.
- 40 CFR 60.106a Monitoring of emissions and operations for sulfur recovery plants.
- 40 CFR 60.107a Monitoring of emissions and operations for fuel gas combustion devices and flares.
- 40 CFR 60.109a Delegation of authority.
- 40 CFR 60.11 Compliance with standards and maintenance requirements.
- 40 CFR 60.1230 What continuous emission monitoring systems must I install for gaseous pollutants?
- 40 CFR 60.124 Monitoring requirements.
- 40 CFR 60.124a Monitoring requirements.
- 40 CFR 60.1260 What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems and is the data collection requirement enforceable?
- 40 CFR 60.1270 What is required for my continuous opacity monitoring system and how are the data used?
- 40 CFR 60.143 Monitoring of operations.
- 40 CFR 60.165 Monitoring of operations.
- 40 CFR 60.1720 What continuous emission monitoring systems must I install for gaseous pollutants?
- 40 CFR 60.175 Monitoring of operations.
- 40 CFR 60.1750 What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems and is the data collection requirement enforceable?
- 40 CFR 60.1760 What is required for my continuous opacity monitoring system and how are the data used?
- 40 CFR 60.18 General control device and work practice requirements.
- 40 CFR 60.185 Monitoring of operations.
- 40 CFR 60.2145 How do I demonstrate continuous compliance with the emission limitations and the operating limits?
- 40 CFR 60.2165 What monitoring equipment must I install and what parameters must I monitor?
95 more
- 40 CFR 60.256 Continuous monitoring requirements.
- 40 CFR 60.265 Monitoring of operations.
- 40 CFR 60.2710 How do I demonstrate continuous compliance with the amended emission limitations and the operating limits?
- 40 CFR 60.2730 What monitoring equipment must I install and what parameters must I monitor?
- 40 CFR 60.284 Monitoring of emissions and operations.
- 40 CFR 60.284a Monitoring of emissions and operations.
- 40 CFR 60.288a Reporting.
- 40 CFR 60.2939 What continuous emission monitoring systems must I install?
- 40 CFR 60.2942 What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems, and is the data collection requirement enforceable?
- 40 CFR 60.3038 What continuous emission monitoring systems must I install?
- 40 CFR 60.3041 What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems, and is the data collection requirement enforceable?
- 40 CFR 60.334 Monitoring of operations.
- 40 CFR 60.392a Standards for volatile organic compounds.
- 40 CFR 60.394a Add-on control device operating limits and monitoring requirements.
- 40 CFR 60.395a Notifications, reports, and records.
- 40 CFR 60.4 Address.
- 40 CFR 60.4345 What are the requirements for the continuous emission monitoring system equipment, if I choose to use this option?
- 40 CFR 60.4350 How do I use data from the continuous emission monitoring equipment to identify excess emissions?
- 40 CFR 60.45 Emissions and fuel monitoring.
- 40 CFR 60.45c Compliance and performance test methods and procedures for particulate matter.
- 40 CFR 60.46b Compliance and performance test methods and procedures for particulate matter and nitrogen oxides.
- 40 CFR 60.46c Emission monitoring for sulfur dioxide.
- 40 CFR 60.47b Emission monitoring for sulfur dioxide.
- 40 CFR 60.47c Emission monitoring for particulate matter.
- 40 CFR 60.4865 How and when do I demonstrate initial compliance with the emission limits and standards?
- 40 CFR 60.4880 How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection, and ash handling systems, and by what date must I conduct an initial performance evaluation?
- 40 CFR 60.4885 How and when do I demonstrate continuous compliance with the emission limits and standards?
- 40 CFR 60.48Da Compliance provisions.
- 40 CFR 60.48b Emission monitoring for particulate matter and nitrogen oxides.
- 40 CFR 60.4900 What are the performance testing, monitoring, and calibration requirements for compliance with the emission limits and standards?
- 40 CFR 60.4905 What are the monitoring and calibration requirements for compliance with my operating limits?
- 40 CFR 60.49Da Emission monitoring.
- 40 CFR 60.49b Reporting and recordkeeping requirements.
- 40 CFR 60.504a Monitoring requirements.
- 40 CFR 60.5185 How and when do I demonstrate initial compliance with the emission limits and standards?
- 40 CFR 60.5200 How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection, and ash handling systems, and by what date must I conduct an initial performance evaluation?
- 40 CFR 60.5205 How and when do I demonstrate continuous compliance with the emission limits and standards?
- 40 CFR 60.5220 What are the performance testing, monitoring, and calibration requirements for compliance with the emission limits and standards?
- 40 CFR 60.5225 What are the monitoring and calibration requirements for compliance with my operating limits?
- 40 CFR 60.5407 What are the requirements for monitoring of emissions and operations from my sweetening unit affected facilities at onshore natural gas processing plants?
- 40 CFR 60.5407a What are the requirements for monitoring of emissions and operations from my sweetening unit affected facilities?
- 40 CFR 60.5407b What are the requirements for monitoring of emissions and operations from my sweetening unit affected facilities?
- 40 CFR 60.5417 What are the continuous control device monitoring requirements for my storage vessel or centrifugal compressor affected facility?
- 40 CFR 60.5417a What are the continuous control device monitoring requirements for my centrifugal compressor and storage vessel affected facilities?
- 40 CFR 60.5417b What are the continuous monitoring requirements for my control devices?
- 40 CFR 60.5417c What are the continuous monitoring requirements for my control devices?
- 40 CFR 60.5535 How do I monitor and collect data to demonstrate compliance?
- 40 CFR 60.5535a How do I monitor and collect data to demonstrate compliance?
- 40 CFR 60.580 Applicability and designation of affected facility.
- 40 CFR 60.5860b What applicable monitoring, recordkeeping, and reporting requirements do I need to include in my State plan for affected EGUs?
- 40 CFR 60.58a Compliance and performance testing.
- 40 CFR 60.58b Compliance and performance testing.
- 40 CFR 60.614a What test methods and procedures must I use to determine compliance with the standards?
- 40 CFR 60.63 Monitoring of operations.
- 40 CFR 60.646 Monitoring of emissions and operations.
- 40 CFR 60.66 Delegation of authority.
- 40 CFR 60.664a What test methods and procedures must I use to determine compliance with the standards?
- 40 CFR 60.683 Monitoring of operations.
- 40 CFR 60.7 Notification and record keeping.
- 40 CFR 60.704a What test methods and procedures must I use to determine compliance with the standards?
- 40 CFR 60.73 Emission monitoring.
- 40 CFR 60.73a Emissions testing and monitoring.
- 40 CFR 60.84 Emission monitoring.
- 40 CFR 61.163 Emission monitoring.
- 40 CFR 61.175 Monitoring requirements.
- 40 CFR 61.183 Emission monitoring.
- 40 CFR 62.14640a How do I demonstrate continuous compliance with the emission limitations and the operating limits?
- 40 CFR 62.14665a What monitoring equipment must I install and what parameters must I monitor?
- 40 CFR 62.15175 What continuous emission monitoring systems must I install for gaseous pollutants?
- 40 CFR 62.15205 What minimum amount of monitoring data must I collect with my continuous emission monitoring systems and is this requirement enforceable?
- 40 CFR 62.15215 What is required for my continuous opacity monitoring system and how are the data used?
- 40 CFR 62.15980 How and when do I demonstrate initial compliance with the emission limits and standards?
- 40 CFR 62.15995 How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection, and ash handling systems, and by what date must I conduct an initial performance evaluation?
- 40 CFR 62.16000 How and when do I demonstrate continuous compliance with the emission limits and standards?
- 40 CFR 62.16015 What are the performance testing, monitoring, and calibration requirements for compliance with the emission limits and standards?
- 40 CFR 62.16020 What are the monitoring and calibration requirements for compliance with my operating limits?
- 40 CFR 63.1626 What monitoring requirements must I meet?
- 40 CFR 63.848 Emission monitoring requirements.
- 40 CFR 64.3 Monitoring design criteria.
- 40 CFR 98.34 Monitoring and QA/QC requirements.
- 40 CFR Appendix A to Subpart O of Part 63 Monitoring Provisions for EtO CEMS
- 40 CFR Appendix A to Subpart UUUUU of Part 63 Hg Monitoring Provisions
- 40 CFR Appendix B to Part 60 Performance Specifications
- 40 CFR Appendix B to Subpart UUUUU of Part 63 -HCl and HF Monitoring Provisions
- 40 CFR Appendix C to Subpart UUUUU of Part 63 PM Monitoring Provisions
- 40 CFR Appendix F to Part 60 Quality Assurance Procedures
- 40 CFR Appendix G to Part 60 Provisions for an Alternative Method of Demonstrating Compliance With 40 CFR 60.43 for the Newton Power Station of Central Illinois Public Service Company
- 40 CFR Table 3 to Subpart JJJJ of Part 60 Applicability of General Provisions to Subpart JJJJ
- 40 CFR Table 3 to Subpart OOOO of Part 60 Applicability of General Provisions to Subpart OOOO
- 40 CFR Table 3 to Subpart OOOOa of Part 60 Applicability of General Provisions to Subpart OOOOa
- 40 CFR Table 3 to Subpart TTTT of Part 60 Applicability of Subpart A of Part 60 (General Provisions) to Subpart TTTT
- 40 CFR Table 3 to Subpart TTTTa of Part 60 Applicability of Subpart A of Part 60 (General Provisions) to Subpart TTTTa
- 40 CFR Table 4 to Subpart OOOOc of Part 60 Applicability of General Provisions to Subpart OOOOc
- 40 CFR Table 5 to Subpart OOOOb of Part 60 Applicability of General Provisions to Subpart OOOOb
- 40 CFR Table 8 to Subpart IIII of Part 60 Applicability of General Provisions to Subpart IIII