Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
40 CFR 75.53 Monitoring plan.
40 CFR 75.53 Monitoring plan., “Monitoring plan”, is a CFR section of 40 CFR Part 75, Subpart F—Recordkeeping Requirements; in force.
https://ontology.bommaritollc.com/id/01a0f0b0-0ef0-74a2-b695-acc8bfea8c72
Elsewhere
Facts
| adms:identifier | |
| eli:cites | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 40 CFR 75.53 |
| schema:legislationJurisdiction | |
| schema:legislationLegalForce | |
| schema:legislationType | |
| schema:name | Monitoring planen |
| schema:url | |
| skos:prefLabel | 40 CFR 75.53 Monitoring plan.en |
Related
Cited by (27)eli:cites
- 40 CFR 60.5535 How do I monitor and collect data to demonstrate compliance?
- 40 CFR 60.5535a How do I monitor and collect data to demonstrate compliance?
- 40 CFR 60.5560 What records must I maintain?
- 40 CFR 60.5560a What records must I maintain?
- 40 CFR 60.5860b What applicable monitoring, recordkeeping, and reporting requirements do I need to include in my State plan for affected EGUs?
- 40 CFR 63.10031 What reports must I submit and when?
- 40 CFR 74.19 Revision and renewal of opt-in permit.
- 40 CFR 74.61 Monitoring plan.
- 40 CFR 75.10 General operating requirements.
- 40 CFR 75.16 Special provisions for monitoring emissions from common, bypass, and multiple stacks for SO2 emissions and heat input determinations.
- 40 CFR 75.17 Specific provisions for monitoring emissions from common, bypass, and multiple stacks for NO X emission rate.
- 40 CFR 75.20 Initial certification and recertification procedures.
- 40 CFR 75.33 Standard missing data procedures for SO2, NOX, and flow rate.
- 40 CFR 75.57 General recordkeeping provisions.
- 40 CFR 75.59 Certification, quality assurance, and quality control record provisions.
- 40 CFR 75.62 Monitoring plan submittals.
- 40 CFR 75.63 Initial certification or recertification application.
- 40 CFR 75.64 Quarterly reports.
- 40 CFR 75.72 Determination of NOX mass emissions for common stack and multiple stack configurations.
- 40 CFR 75.73 Recordkeeping and reporting.
- 40 CFR Appendix A to Part 75 Specifications and Test Procedures
- 40 CFR Appendix A to Subpart O of Part 63 Monitoring Provisions for EtO CEMS
- 40 CFR Appendix A to Subpart UUUUU of Part 63 Hg Monitoring Provisions
- 40 CFR Appendix B to Subpart UUUUU of Part 63 -HCl and HF Monitoring Provisions
- 40 CFR Appendix C to Part 75 Missing Data Estimation Procedures
- 40 CFR Appendix C to Subpart UUUUU of Part 63 PM Monitoring Provisions
- 40 CFR Appendix D to Part 75 Optional SO2 Emissions Data Protocol for Gas-Fired and Oil-Fired Units