Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
40 CFR 75.33 Standard missing data procedures for SO2, NOX, and flow rate.
40 CFR 75.33 Standard missing data procedures for SO2, NOX, and flow rate., “Standard missing data procedures for SO2, NOX, and flow rate”, is a CFR section of 40 CFR Part 75, Subpart D—Missing Data Substitution Procedures; in force.
https://ontology.bommaritollc.com/id/01a0f0b0-0ed9-7693-8920-3c8df47ded46
Elsewhere
Facts
| adms:identifier | |
| eli:cites | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 40 CFR 75.33 |
| schema:legislationJurisdiction | |
| schema:legislationLegalForce | |
| schema:legislationType | |
| schema:name | Standard missing data procedures for SO2, NOX, and flow rateen |
| schema:url | |
| skos:prefLabel | 40 CFR 75.33 Standard missing data procedures for SO2, NOX, and flow rate.en |
Related
Cited by (14)eli:cites
- 40 CFR 72.2 Definitions.
- 40 CFR 75.16 Special provisions for monitoring emissions from common, bypass, and multiple stacks for SO2 emissions and heat input determinations.
- 40 CFR 75.17 Specific provisions for monitoring emissions from common, bypass, and multiple stacks for NO X emission rate.
- 40 CFR 75.20 Initial certification and recertification procedures.
- 40 CFR 75.30 General provisions.
- 40 CFR 75.32 Determination of monitor data availability for standard missing data procedures.
- 40 CFR 75.34 Units with add-on emission controls.
- 40 CFR 75.35 Missing data procedures for CO2..
- 40 CFR 75.36 Missing data procedures for heat input rate determinations.
- 40 CFR 75.37 Missing data procedures for moisture.
- 40 CFR 75.70 NOX mass emissions provisions.
- 40 CFR 75.72 Determination of NOX mass emissions for common stack and multiple stack configurations.
- 40 CFR 75.74 Annual and ozone season monitoring and reporting requirements.
- 40 CFR Appendix A to Part 75 Specifications and Test Procedures