Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
40 CFR 75.74 Annual and ozone season monitoring and reporting requirements.
40 CFR 75.74 Annual and ozone season monitoring and reporting requirements., “Annual and ozone season monitoring and reporting requirements”, is a CFR section of 40 CFR Part 75, Subpart H—NOX Mass Emissions Provisions; in force.
https://ontology.bommaritollc.com/id/01a0f0b0-0f08-777f-8bbe-8884d7344d7d
Elsewhere
Facts
| adms:identifier | |
| eli:cites | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 40 CFR 75.74 |
| schema:legislationJurisdiction | |
| schema:legislationLegalForce | |
| schema:legislationType | |
| schema:name | Annual and ozone season monitoring and reporting requirementsen |
| schema:url | |
| skos:prefLabel | 40 CFR 75.74 Annual and ozone season monitoring and reporting requirements.en |
Related
Cited by (21)eli:cites
- 40 CFR 72.2 Definitions.
- 40 CFR 75.19 Optional SO2, NOX, and CO2 emissions calculation for low mass emissions (LME) units.
- 40 CFR 75.20 Initial certification and recertification procedures.
- 40 CFR 75.21 Quality assurance and quality control requirements.
- 40 CFR 75.34 Units with add-on emission controls.
- 40 CFR 75.59 Certification, quality assurance, and quality control record provisions.
- 40 CFR 75.68 Temporary modifications to otherwise applicable quality-assurance requirements during the COVID-19 national emergency.
- 40 CFR 75.70 NOX mass emissions provisions.
- 40 CFR 75.71 Specific provisions for monitoring NOX and heat input for the purpose of calculating NOX mass emissions.
- 40 CFR 96.374 Recordkeeping and reporting.
- 40 CFR 96.70 General requirements.
- 40 CFR 96.74 Recordkeeping and reporting.
- 40 CFR 97.1034 Recordkeeping and reporting.
- 40 CFR 97.374 Recordkeeping and reporting.
- 40 CFR 97.534 Recordkeeping and reporting.
- 40 CFR 97.70 General requirements.
- 40 CFR 97.74 Recordkeeping and reporting.
- 40 CFR 97.834 Recordkeeping and reporting.
- 40 CFR Appendix A to Part 75 Specifications and Test Procedures
- 40 CFR Appendix B to Part 75 Quality Assurance and Quality Control Procedures
- 40 CFR Appendix E to Part 75 Optional NOX Emissions Estimation Protocol for Gas-Fired Peaking Units and Oil-Fired Peaking Units