43 CFR Part 3200, Subpart 3261—Drilling Operations: Getting a Permit
43 CFR Part 3200, Subpart 3261—Drilling Operations: Getting a Permit, “Drilling Operations: Getting a Permit”, is a CFR division of 43 CFR Part 3200—Geothermal resource leasing.
https://ontology.bommaritollc.com/id/01a0f0b6-24e7-73d1-acd7-1418bbc9c70a
Elsewhere
Facts
| adms:identifier | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 43 CFR Part 3200, Subpart 3261 |
| schema:legislationJurisdiction | |
| schema:legislationType | |
| schema:name | Drilling Operations: Getting a Permiten |
| skos:prefLabel | 43 CFR Part 3200, Subpart 3261—Drilling Operations: Getting a Permiten |
Related
Parts (13)schema:isPartOf
- 43 CFR 3261.10 How do I get approval to begin well pad construction?
- 43 CFR 3261.11 How do I apply for approval of drilling operations and well pad construction?
- 43 CFR 3261.12 What is an operations plan?
- 43 CFR 3261.13 What is a drilling program and how do I apply for drilling program approval?
- 43 CFR 3261.14 When must I give BLM my operations plan?
- 43 CFR 3261.15 Must I give BLM my drilling permit application, drilling program, and operations plan at the same time?
- 43 CFR 3261.16 Can my operations plan, drilling permit, and drilling program apply to more than one well?
- 43 CFR 3261.17 How do I amend my operations plan or drilling permit?
- 43 CFR 3261.18 Do I need to file a bond with BLM before I build a well pad or drill a well?
- 43 CFR 3261.19 When will BLM release my bond?
- 43 CFR 3261.20 How will BLM review applications submitted under this subpart and notify me of its decision?
- 43 CFR 3261.21 How do I get approval to change an approved drilling operation?
- 43 CFR 3261.22 How do I get approval for subsequent well operations?