bc-ontologyGovernments, institutions, geography and law
Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.

FR Doc. 2023-11190: Draft Interim Staff Guidance: Advanced Reactor Content of Application Project Chapter 12, “Post-Construction Inspection, Testing, and Analysis Program”

FR Doc. 2023-11190: Draft Interim Staff Guidance: Advanced Reactor Content of Application Project Chapter 12, “Post-Construction Inspection, Testing, and Analysis Program”, “Draft Interim Staff Guidance: Advanced Reactor Content of Application Project Chapter 12, “Post-Construction…”, is a Federal Register notice, by Nuclear Regulatory Commission.

https://ontology.bommaritollc.com/id/01a110b2-6fe6-77d3-b85c-2d37bd3d8c75
schema:Legislation
Download TurtleJSON-LDN-TriplesMarkdown
Cite this
FR Doc. 2023-11190: Draft Interim Staff Guidance: Advanced Reactor Content of Application Project Chapter 12, “Post-Construction Inspection, Testing, and Analysis Program”. bc-ontology, release 0.1.0-rc38, 2026-10-21. https://ontology.bommaritollc.com/id/01a110b2-6fe6-77d3-b85c-2d37bd3d8c75

Elsewhere

Facts

adms:identifier
dcterms:bibliographicCitation
88 FR 33920
dcterms:issued
2023-05-25xsd:date
prov:wasDerivedFrom
schema:legislationIdentifier
FR Doc. 2023-11190
schema:legislationJurisdiction
schema:legislationPassedBy
schema:legislationType
schema:name
Draft Interim Staff Guidance: Advanced Reactor Content of Application Project Chapter 12, “Post-Construction Inspection, Testing, and Analysis Program”en
schema:url
skos:prefLabel
FR Doc. 2023-11190: Draft Interim Staff Guidance: Advanced Reactor Content of Application Project Chapter 12, “Post-Construction Inspection, Testing, and Analysis Program”en

Related

Its event of, from (1)bcleg:eventOf