Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
33 CFR Part 154, Subpart P, Subject Group: Transfer Facilities—VCS Design and Installation—Transfer Facilities—VCS Design and Installation
33 CFR Part 154, Subpart P, Subject Group: Transfer Facilities—VCS Design and Installation—Transfer Facilities—VCS Design and Installation, “Transfer Facilities—VCS Design and Installation”, is a CFR division of 33 CFR Part 154, Subpart P—Marine Vapor Control Systems.
https://ontology.bommaritollc.com/id/01a0f0a2-be24-745b-8c0b-80e11ae6b4b0
Elsewhere
Facts
| adms:identifier | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 33 CFR Part 154, Subpart P, Subject Group: Transfer Facilities—VCS Design and Installation |
| schema:legislationJurisdiction | |
| schema:legislationType | |
| schema:name | Transfer Facilities—VCS Design and Installationen |
| skos:prefLabel | 33 CFR Part 154, Subpart P, Subject Group: Transfer Facilities—VCS Design and Installation—Transfer Facilities—VCS Design and Installationen |
Related
Parts (14)schema:isPartOf
- 33 CFR 154.2100 Vapor control system, general.
- 33 CFR 154.2101 Requirements for facility vapor connections.
- 33 CFR 154.2102 Facility requirements for vessel liquid overfill protection.
- 33 CFR 154.2103 Facility requirements for vessel vapor overpressure and vacuum protection.
- 33 CFR 154.2104 Pigging system.
- 33 CFR 154.2105 Fire, explosion, and detonation protection.
- 33 CFR 154.2106 Detonation arresters installation.
- 33 CFR 154.2107 Inerting, enriching, and diluting systems.
- 33 CFR 154.2108 Vapor-moving devices.
- 33 CFR 154.2109 Vapor recovery and vapor destruction units.
- 33 CFR 154.2110 Vapor balancing requirements.
- 33 CFR 154.2111 Vapor control system connected to a facility's main vapor control system.
- 33 CFR 154.2112 Vapors with potential to polymerize or freeze—Special requirements.
- 33 CFR 154.2113 Alkylene oxides—Special requirements.