Pre-release: this release has not been published. Identifiers are permanent; descriptions may still change.
33 CFR 154.2101 Requirements for facility vapor connections.
33 CFR 154.2101 Requirements for facility vapor connections., “Requirements for facility vapor connections”, is a CFR section of 33 CFR Part 154, Subpart P, Subject Group: Transfer Facilities—VCS Design and Installation—Transfer Facilities—VCS Design and Installation; in force.
https://ontology.bommaritollc.com/id/01a0f0a2-d002-7479-8339-83032d56c99c
Elsewhere
Facts
| adms:identifier | |
| eli:cites | |
| prov:wasDerivedFrom | |
| schema:isPartOf | |
| schema:legislationIdentifier | 33 CFR 154.2101 |
| schema:legislationJurisdiction | |
| schema:legislationLegalForce | |
| schema:legislationType | |
| schema:name | Requirements for facility vapor connectionsen |
| schema:url | |
| skos:prefLabel | 33 CFR 154.2101 Requirements for facility vapor connections.en |
Related
Cited by (15)eli:cites
- 33 CFR 154.106 Incorporation by reference.
- 33 CFR 154.2022 Certification, recertification, or operational review—certifying entity responsibilities, generally.
- 33 CFR 154.2100 Vapor control system, general.
- 33 CFR 154.2102 Facility requirements for vessel liquid overfill protection.
- 33 CFR 154.2103 Facility requirements for vessel vapor overpressure and vacuum protection.
- 33 CFR 154.2104 Pigging system.
- 33 CFR 154.2105 Fire, explosion, and detonation protection.
- 33 CFR 154.2107 Inerting, enriching, and diluting systems.
- 33 CFR 154.2109 Vapor recovery and vapor destruction units.
- 33 CFR 154.2150 General requirements.
- 33 CFR 154.2201 Vapor control system—general requirements.
- 33 CFR 154.2202 Vapor line connections.
- 33 CFR 154.2203 Facility requirements for barge vapor overpressure and vacuum protection.
- 33 CFR 154.2250 General requirements.
- 46 CFR 35.35-4 Insulating flange joint or nonconductive hose—TB/ALL.